New Irun Museum · Ikust Alaia
Museum programme report | Irun | 2023Report for implementing the museum requirements programme for the galleries of the new Irun Museum, in the Ikust Alaia building.
The report set out the technical museum equipment needed for the galleries, the lighting and the preventive conservation of the pieces to be displayed.
- Location
- Ikust Alaia, Irun
- Year
- 2023
- Client
- Koma Kultura Zerbitzuak
- Scope
- Report for implementing the museum requirements programme
- Collective
- Oso Kolektiboa (Hiruki studio and Marmol estudioa)

Next project
Diocesan Museum of Gipuzkoa →
← Back to projects